Projects

Geologically Investigation and Strengthening of Ancient City Hasankeyf


  • Roads and bridges

    Deriviation of Tigris River

    Injection of Caves

    Stabilization Works like geogrids,nets

    Falling down the dangerous rocks

    Strengthening of Ancient Buildings

  • 40.000.000,00 USD (2019)

  • Reinforcement

  • 300.000 m³

  • 3.000.000 m³

  • 23.000 m³

  • 300.000 kg.

  • 1.200 m2.

  • 11.000 kg.

  • 40.000 m³.

General Condition
80%
Phase 1
85%
Phase 2
75%
Phase 3
85%
Phase 4
71%